2020 ]             IN RE : CONSULTING ENGINEERS GROUP LTD.           159
                            (b)  Arrange,  coordinate and be available  for consultation in  all
                                 stages of construction of the project, and accordingly ensure
                                 modification of the project component, if any
                            (c) Contract administration and management of the project
                            (d)  Prepare construction supervision manual, which shall specify
                                 quality control and quality assurance aspects and methodol-
                                 ogy for the following phrases of the project
                                  •     Mobilization phase
                                  •     Inception Report & Quality audits.
                                  •     Pre-construction stage.
                                  •     Construction stage
                                  •     Final quality checking
                                  •     Post construction stage & final wrap up
                                  •     The manuals shall emphasise on continuous quality
                                        standards & tests of material, field test to be conduct-
                                        ed at  their  frequency strictly in accordance  with  IS
                                        specifications APDSS MOST MORTH/IRC/codes.
                            (e)  Interpretation of the technical specification for each item pro-
                                 ject.
                            (f)  Supervise  and monitor construction  work of each contract
                                 package.
                            (g)  Checking the alignment  (LS/CS), level and  specification of
                                 the construction to ensure conformity with the contract speci-
                                 fication, presentation for approval to the competent authority
                                 any change in plans that may be deemed necessary indicating
                                 the effects due to the change in the contract, and preparation
                                 of variation orders accordingly.
                            (h)  Scrutinize the contractors detailed work program and guide
                                 contractor in presentation of supervision schedule/work plan
                                 for each package.
                            (i)  Scrutinize construction methods proposed by contractor in-
                                 cluding environmental, disaster management, safety, person-
                                 al and public issues.
                            (j)   Assess the adequacy and quality of contractor’s supervisory
                                 staff and manpower and other input in material, labour and
                                 construction  methodology and provide advisors  when re-
                                 quired.
                            (k)  Monitor the construction method by assessing the adequacy
                                 of the contractors input material, labour, equipment and con-
                                 struction methods.
                            (l)  Monitor implementation of  environmental  standards and
                                 safeguards, and any resettlement plans.
                            (m)  Review and ensure the quality assurance system for project of
                                 all material process that includes quality of all types of mate-
                                 rial  and certification by  TPQM/IQM. At least 10% of the
                                 mandatory tests prescribed in the specifications of work are
                                    GST LAW TIMES      13th August 2020      73