2020 ] IN RE : CONSULTING ENGINEERS GROUP LTD. 159
(b) Arrange, coordinate and be available for consultation in all
stages of construction of the project, and accordingly ensure
modification of the project component, if any
(c) Contract administration and management of the project
(d) Prepare construction supervision manual, which shall specify
quality control and quality assurance aspects and methodol-
ogy for the following phrases of the project
• Mobilization phase
• Inception Report & Quality audits.
• Pre-construction stage.
• Construction stage
• Final quality checking
• Post construction stage & final wrap up
• The manuals shall emphasise on continuous quality
standards & tests of material, field test to be conduct-
ed at their frequency strictly in accordance with IS
specifications APDSS MOST MORTH/IRC/codes.
(e) Interpretation of the technical specification for each item pro-
ject.
(f) Supervise and monitor construction work of each contract
package.
(g) Checking the alignment (LS/CS), level and specification of
the construction to ensure conformity with the contract speci-
fication, presentation for approval to the competent authority
any change in plans that may be deemed necessary indicating
the effects due to the change in the contract, and preparation
of variation orders accordingly.
(h) Scrutinize the contractors detailed work program and guide
contractor in presentation of supervision schedule/work plan
for each package.
(i) Scrutinize construction methods proposed by contractor in-
cluding environmental, disaster management, safety, person-
al and public issues.
(j) Assess the adequacy and quality of contractor’s supervisory
staff and manpower and other input in material, labour and
construction methodology and provide advisors when re-
quired.
(k) Monitor the construction method by assessing the adequacy
of the contractors input material, labour, equipment and con-
struction methods.
(l) Monitor implementation of environmental standards and
safeguards, and any resettlement plans.
(m) Review and ensure the quality assurance system for project of
all material process that includes quality of all types of mate-
rial and certification by TPQM/IQM. At least 10% of the
mandatory tests prescribed in the specifications of work are