                                                  (e)   The responsibility of the Contractor includes providing ade-
                                                      quate number of sorting machines for achieving the daily tar-
                                                      get as per the capacity quoted in the bid.
                                                  (f)   The Contractor will be required to provide at site storage facil-
                                                      ity for various wastes processed.
                                                  (g)  The bidder shall handover any domestic hazardous waste, bi-
                                                      omedical, C  & D waste if found during excavation,  sort-
                                                      ing/segregation. He shall handover the waste to nearest bio-
                                                      medical, C & D facility, waste management facility. The Sani-
                                                      tary Inspector should make necessary  arrangements to
                                                      transport the same to the concerned.
                                                  (h)  The bidder shall handover any valuable items like gold, dia-
                                                      monds and all precious metals other than iron scrap material
                                                      to TSCCL.
                                            (1.2)  Recovery of City Compost
                                                  (a)  The Contractor should target to separate the compost from the
                                                      biodegradable component of the solid waste at the dump site.
                                                  (b)  The Contractor should ensure total stabilization of the waste
                                                      dump so that it releases no offensive odours and generates no
                                                      leachates,  so as to have the  reclaimed land fit for any other
                                                      purpose including construction after the settling period as ap-
                                                      proved scientifically.
                                                  (c)   The Contractor should take precaution of minimizing flies,
                                                      rodents and birdmenace and fire hazards.
                                                  (d)  The Contractor should as  in above  section deal with  pre-
                                                      process output such as RDF, while recyclables be sold to ap-
                                                      propriate vendors. The pre-process and post composting pro-
                                                      cess rejects shall be handled as per SWM Rules, 2016. The bid-
                                                      der should explore the possibility of minimizing the quantum
                                                      of inert with alternatives. The accumulated  inert/rejects
                                                      should not sent for any other applications/uses.
                                                  (e)   The plastic material segregated from the  compost shall be
                                                      handled as per Solid Waste Management Rules, 2016.
                                                  (f)   After the removal of dump, the site shall be reclaimed to its
                                                      natural ground level.
                                                  (g)  The transportation and storage of the inert material and  the
                                                      compost material shall entirely be under the scope of the bid-
                                                      der under this project.
                                            (1.2.1)  Site development & facilities
                                                  (a)  The TMC shall assist successful bidder in getting the access to
                                                      the dumpsite with a license to the Contractor to implement the
                                                      project “Remediation of Ramapuram Dumpsite through Bio-
                                                      mining process”system.
                                                  (b)  The Contractor should carry out necessary geotechnical  sur-
                                                      veys for considering the hydrological and flooding potential at
                                                      sites, in order  to mitigate any  effect on the activities during
                                                      bio-mining in terms of leachate transport.
                                                  (c)   The site which shall be utilised for Machinery and material
                                                      under Bio-Mining process shall be fenced or hedged and pro-