(e) The responsibility of the Contractor includes providing ade-
quate number of sorting machines for achieving the daily tar-
get as per the capacity quoted in the bid.
(f) The Contractor will be required to provide at site storage facil-
ity for various wastes processed.
(g) The bidder shall handover any domestic hazardous waste, bi-
omedical, C & D waste if found during excavation, sort-
ing/segregation. He shall handover the waste to nearest bio-
medical, C & D facility, waste management facility. The Sani-
tary Inspector should make necessary arrangements to
transport the same to the concerned.
(h) The bidder shall handover any valuable items like gold, dia-
monds and all precious metals other than iron scrap material
to TSCCL.
(1.2) Recovery of City Compost
(a) The Contractor should target to separate the compost from the
biodegradable component of the solid waste at the dump site.
(b) The Contractor should ensure total stabilization of the waste
dump so that it releases no offensive odours and generates no
leachates, so as to have the reclaimed land fit for any other
purpose including construction after the settling period as ap-
proved scientifically.
(c) The Contractor should take precaution of minimizing flies,
rodents and birdmenace and fire hazards.
(d) The Contractor should as in above section deal with pre-
process output such as RDF, while recyclables be sold to ap-
propriate vendors. The pre-process and post composting pro-
cess rejects shall be handled as per SWM Rules, 2016. The bid-
der should explore the possibility of minimizing the quantum
of inert with alternatives. The accumulated inert/rejects
should not sent for any other applications/uses.
(e) The plastic material segregated from the compost shall be
handled as per Solid Waste Management Rules, 2016.
(f) After the removal of dump, the site shall be reclaimed to its
natural ground level.
(g) The transportation and storage of the inert material and the
compost material shall entirely be under the scope of the bid-
der under this project.
(1.2.1) Site development & facilities
(a) The TMC shall assist successful bidder in getting the access to
the dumpsite with a license to the Contractor to implement the
project “Remediation of Ramapuram Dumpsite through Bio-
mining process”system.
(b) The Contractor should carry out necessary geotechnical sur-
veys for considering the hydrological and flooding potential at
sites, in order to mitigate any effect on the activities during
bio-mining in terms of leachate transport.
(c) The site which shall be utilised for Machinery and material
under Bio-Mining process shall be fenced or hedged and pro-
GST LAW TIMES 13th August 2020 98