Page 146 - GSTL_21st May 2020_Vol 36_Part 3
P. 146
392 GST LAW TIMES [ Vol. 36
66 Fuel cost adjustment Amount billed towards fuel cost like Petrol, Diesel
charges borne by company for transport at the time of bill-
ing as per KERC regulations. The amount is revised
every 3 months by KERC.
67 Power Factor penalty Penalty levied if the power recorded by the capaci-
tor is excess than standard power factor stipulate at
the time of agreement for both HT and LT connec-
tion during bill cycle. The charges will be levied on
the excess power recorded as Power factor penalty
68 Meter Burnt-out Cost Amount collected towards Burnt out meter (for
various reasons like short circuit, overload) Pend-
ing decision Subjected to Finding fault from either
party. Refund Subjected to the condition fault
Found on Distribution side. If the fault is from con-
sumer the amount account as income
PRE CONNECTION-FEES/AMOUNT COLLECED FOR PRE SERVICE
CONNECTION OF ELECTRICITY RELATED SUPPLY
69 Application Fee Application Fee collected from the consumers for
initial connection of Electricity supply to their
premises as per KERC regulations.
70 Collection of Registra- Registration Fee collected from the consumers for
tion Fee on HT/LT/ Temporary connection of Electricity supply KERC
Temporary Applica- regulations.
tion on supply of
Electricity
71 Facilitation fee to- After installation of Solar Roof Top system (SRTPV)
wards Solar Roof Top in the consumer’s premises, facilitation fee is col-
system (SRTPV) lected from the consumers for the Supervision Ser-
vices provided by CESC from time to time.
72 Registration fee to- Registration fee collected from consumers for new
wards Solar Roof Top connection of Solar Roof Top system (SRTPV) in
system (SRTPV) their premises
73 Facilitation fee to- After installation of Solar Roof Top system (SRTPV)
wards Solar Roof Top in the consumer’s premises, facilitation fee is col-
system (SRTPV) lected from the consumers for Supervision Services
provided by CESC from time to time.
74 Regularization of the Charges collected from Consumers for new connec-
unauthorized IP SET tion/regularization (Infrastructures Charges) of
Infrastructures connection for providing Electricity supply to Irri-
Charges gation Pump set.
75 Vendor Approval Fee Amount collected for providing approval of vendor
for supply of Goods/Services for CESC who is
qualified as per terms and conditions of the tender
GST LAW TIMES 21st May 2020 146