                                      66  Fuel cost adjustment  Amount billed towards fuel cost like Petrol, Diesel
                                          charges              borne by company for transport at the time of bill-
                                                               ing as per KERC regulations. The amount is revised
                                                               every 3 months by KERC.
                                      67  Power Factor penalty  Penalty levied if the power recorded by the capaci-
                                                               tor is excess than standard power factor stipulate at
                                                               the time of agreement for both HT and LT connec-
                                                               tion during bill cycle. The charges will be levied on
                                                               the excess power recorded as Power factor penalty
                                      68  Meter Burnt-out Cost  Amount  collected towards Burnt out meter (for
                                                               various reasons like short  circuit, overload)  Pend-
                                                               ing decision Subjected to Finding fault from either
                                                               party.  Refund Subjected to the condition fault
                                                               Found on Distribution side. If the fault is from con-
                                                               sumer the amount account as income
                                         PRE CONNECTION-FEES/AMOUNT COLLECED FOR PRE SERVICE
                                                CONNECTION OF ELECTRICITY RELATED SUPPLY
                                      69 Application Fee       Application  Fee  collected from the consumers  for
                                                               initial connection of Electricity supply to their
                                                               premises as per KERC regulations.
                                      70 Collection of Registra- Registration  Fee collected from the consumers  for
                                          tion Fee on  HT/LT/  Temporary connection of  Electricity supply KERC
                                          Temporary Applica- regulations.
                                          tion on supply of
                                          Electricity
                                      71  Facilitation fee to- After installation of Solar Roof Top system (SRTPV)
                                          wards Solar Roof Top  in the consumer’s premises,  facilitation fee is col-
                                          system (SRTPV)       lected from the consumers for the Supervision Ser-
                                                               vices provided by CESC from time to time.
                                      72  Registration fee to- Registration fee collected from consumers for new
                                          wards Solar Roof Top  connection of Solar Roof  Top system (SRTPV) in
                                          system (SRTPV)       their premises
                                      73  Facilitation fee to- After installation of Solar Roof Top system (SRTPV)
                                          wards Solar Roof Top  in the consumer’s premises,  facilitation fee is col-
                                          system (SRTPV)       lected from the consumers for Supervision Services
                                                               provided by CESC from time to time.
                                      74 Regularization of the  Charges collected from Consumers for new connec-
                                          unauthorized IP SET  tion/regularization (Infrastructures Charges) of
                                          Infrastructures      connection for providing Electricity supply to Irri-
                                          Charges              gation Pump set.

                                      75 Vendor Approval Fee  Amount collected for providing approval of vendor
                                                               for supply of Goods/Services  for CESC who  is
                                                               qualified as per terms and conditions of the tender