Page 143 - GSTL_21st May 2020_Vol 36_Part 3
P. 143

2020 ]   IN RE : CHAMUNDESHWARI ELECTRICITY SUPPLY CORPORATION LTD.  389
                 POST CONNECTION-FEES/AMOUNT COLLECED FOR POST SERVICE
                          CONNECTION OF ELECTRICITY RELATED SUPPLY
                 37 Miscellaneous  charg- Miscellaneous  charges  levied  for  storage/
                    es  collected for stor- transport/installation of CFL Lamps from the con-
                    age/transport/install sumers  under Belaku Yojane or  any  scheme de-
                    ation of CFL Lamps  clared by State Govt., in respect of Power supply to
                    Under Belaku Yojane.  the consumers
                 38  Re-Connection Fee   If the consumer defaults for payment of Electricity
                                         Bill  for consecutive three months, the Electricity
                                         supply will be disconnected.  When consumer
                                         makes the payment of dues, Re-Connection Fee will
                                         be collected at the time of re-connection of Electrici-
                                         ty supply. Further the amount is collected  in the
                                         Power Bill itself and not collected separately from
                                         the consumers
                 39  Fee  for Testing of  Fee collected from the consumers for the testing of
                    Installation         authenticity  or working  condition of installation
                                         like meter, capacitor, etc for supply of Electricity
                 40 Installation     Fee  Fees Collected form consumer for Issuing No Ob-
                    Collected    towards  jection Certificate (NOC) at the time change of
                    Issue of NOC (No  ownership of the premises
                    Objection Certificate)
                 41  Name Transfer Fee   Name Transfer Fee will be collected from the con-
                                         sumers for change of name from existing consumer
                                         name at the time change of ownership of the prem-
                                         ises by purchase or lease or rent
                 42  Service Line Charges  Amount collected for  giving connection through
                                         Service Line from point of supply to the premises of
                                         the consumer.
                 43  Additional load Fees  Fee collected for Providing additional load of pow-
                                         er in addition to existing load as per requirements
                                         requested by the consumer as per KERC  Regula-
                                         tions.
                 44  Load Reduction Fees  Fee collected for  Providing Reduction  in load  of
                                         power  from  the existing  load as per requirements
                                         requested by the consumer as per KERC  Regula-
                                         tions.
                 45 Disconnection Fee    Amount  collected from the consumers for  discon-
                                         nection of  Power supply services due to non-
                                         payment of  Electricity charges within stipulated
                                         time as per KERC Regulations.

                 46  Reconnection Fee    Amount collected from  the consumers  for  Re-
                                         connection of Power when it is disconnected. Fur-
                                         ther the amount is collected in the Power Bill itself
                                         and not collected separately from the consumers
                                     GST LAW TIMES      21st May 2020      143
   138   139   140   141   142   143   144   145   146   147   148