POST CONNECTION-FEES/AMOUNT COLLECED FOR POST SERVICE
CONNECTION OF ELECTRICITY RELATED SUPPLY
37 Miscellaneous charg- Miscellaneous charges levied for storage/
es collected for stor- transport/installation of CFL Lamps from the con-
age/transport/install sumers under Belaku Yojane or any scheme de-
ation of CFL Lamps clared by State Govt., in respect of Power supply to
Under Belaku Yojane. the consumers
38 Re-Connection Fee If the consumer defaults for payment of Electricity
Bill for consecutive three months, the Electricity
supply will be disconnected. When consumer
makes the payment of dues, Re-Connection Fee will
be collected at the time of re-connection of Electrici-
ty supply. Further the amount is collected in the
Power Bill itself and not collected separately from
the consumers
39 Fee for Testing of Fee collected from the consumers for the testing of
Installation authenticity or working condition of installation
like meter, capacitor, etc for supply of Electricity
40 Installation Fee Fees Collected form consumer for Issuing No Ob-
Collected towards jection Certificate (NOC) at the time change of
Issue of NOC (No ownership of the premises
Objection Certificate)
41 Name Transfer Fee Name Transfer Fee will be collected from the con-
sumers for change of name from existing consumer
name at the time change of ownership of the prem-
ises by purchase or lease or rent
42 Service Line Charges Amount collected for giving connection through
Service Line from point of supply to the premises of
the consumer.
43 Additional load Fees Fee collected for Providing additional load of pow-
er in addition to existing load as per requirements
requested by the consumer as per KERC Regula-
tions.
44 Load Reduction Fees Fee collected for Providing Reduction in load of
power from the existing load as per requirements
requested by the consumer as per KERC Regula-
tions.
45 Disconnection Fee Amount collected from the consumers for discon-
nection of Power supply services due to non-
payment of Electricity charges within stipulated
time as per KERC Regulations.
46 Reconnection Fee Amount collected from the consumers for Re-
connection of Power when it is disconnected. Fur-
ther the amount is collected in the Power Bill itself
and not collected separately from the consumers